Beta
250695b7-2bd2-5eda-ae22-b4160bcc6f27

564- Program Evaluation and Review Technique (PERT) With Computer Application II. PERT/COST

INP Report

Last updated: 17 Dec 2024

Subjects

-

Tags

-

MainTitle

Program Evaluation and Review Technique (PERT) With Computer Application II. PERT/COST

mainSubjects

PERT

computer application

program evaluation

computer

Author

Hamdy A.Taha, Mohamed A.Mongy

Issued

05-1965

Abstract

In the previous memo. (PERT/TIME), the PERT method was introduced and it was shown how the critical path method (CPM) could be used in preparing the time schedule of the project, in pinpointing the areas in the project that needs special attention, and in determining the man-power and equipment necessary to execute the plan. This memo. is a continuation of the above work where additional features are added to incorporate the cost variable in addition to the time variable. The purpose of introducing the cost variable is to develop a plan of action for cost expenditures by applying the necessary cost estimating technique and to act as a monitor in determining where the actual costs are different from estimated costs.

Description

26p

ISO

Eng

Publisher

INP

IsPartOfSeries

سلسلة مذكرات خارجية رقم (564)

Type

Book

Details

Type

INP Report

Created At

15 Dec 2024