Causes and Effects of Delays for Construction Public Pro-jects in Egypt

Article

Last updated: 03 Jan 2025

Subjects

-

Tags

Civil Engineering

Abstract

The research deals with conducting a questionnaire to evaluate the perceptions of the parties to the administrative contracts in the construction public sector, including owners, consultants, and contractors, regarding the causes and effect of delay in project implementation in Egypt in order to determine the main reasons and the impact on them, and then find out the various ways to improve the economy in this important sector. A comprehensive list consisting of (21) ones has been identified. Thirty effects were conducted through a review of the literature, studies and research that dealt with that field, and through interviews with specialists, a comparative study was conducted with other previous works on the most important effect of delay in construction projects. Which resulted in identifying the most important of these causes and their impact using the Relative Importance Index (RII), which is the most widely used method in analyzing the causes and the extent of their impact in the short and long term. The study and analysis concluded with (10) ten main causes of delay in construction industry projects and their impact on creating many Restrictions that represent an obstacle to achieving the desired goals, which in turn negatively affect the economy of the Arab Republic of Egypt.

DOI

10.21608/fuje.2024.344037

Keywords

صناعة التشييد, إدارة الانشاء, تأخير الانشاء, أثار التأخير, الوقت, التكلفة, مصر

Authors

First Name

Ahmed

Last Name

Abdel Karim

MiddleName

Nagy

Affiliation

قسم الهندسه المدنيه, معهد القاهره العالى للهندسه وعلوم الحاسب والأداره,

Email

-

City

-

Orcid

-

First Name

Ashraf

Last Name

Talaat

MiddleName

Ahmed

Affiliation

Civil Engineering Department, Giza Engineering Institute

Email

aatalaat2014@gmail.com

City

-

Orcid

-

Volume

7

Article Issue

2

Related Issue

46380

Issue Date

2024-03-01

Receive Date

2024-03-02

Publish Date

2024-03-01

Page Start

237

Page End

249

Print ISSN

2537-0626

Online ISSN

2537-0634

Link

https://fuje.journals.ekb.eg/article_344037.html

Detail API

https://fuje.journals.ekb.eg/service?article_code=344037

Order

344,037

Type

Original Article

Type Code

651

Publication Type

Journal

Publication Title

Fayoum University Journal of Engineering

Publication Link

https://fuje.journals.ekb.eg/

MainTitle

Causes and Effects of Delays for Construction Public Pro-jects in Egypt

Details

Type

Article

Created At

24 Dec 2024