Beta
282328

IRT-1 Research Reactor Decommissioning Preliminary Plan

Article

Last updated: 23 Dec 2024

Subjects

-

Tags

-

Abstract

The 10th African Conference on Research Reactor Safety, Operation & Utilization
IRT-1 Research Reactor Decommissioning: Preliminary Plan

Eng, Usamah Amara Ben Nail1, Eng. Fathi Mohamed Haj2
Tajora Nuclear Research Center
Osa_om_74@yahoo.com1, Fathi_abduo@yahoo.com2

Abstract:
The Tajora Nuclear Research center (TNRC) has two reactors, one of them with a power of 10 MWth and the other Critical Facility Stand with a power of 100 within operation for 41 years, the status of the research reactor is extended shutdown since 2013, for these reasons, the decommissioning plan it became important. The preliminary decommissioning plan consists of actions and steps required as well as the strategies to be adopted for the shutdown of the facility under the technical and administrative, seeking the safety, of health workers and the general public, and minimizing environmental impacts.
This work aims to develop a preliminary plan for decommissioning the research reactor, considering the technical documentation of the system (SAR-Safety Analysis Report), the existing rules of the Libyan Atomic Energy Establishment, as well as regulatory instructions and recommendations of the IAEA.

DOI

10.21608/ajnsa.2023.172311.1667

Keywords

TNRC, protection, Radiation

Authors

First Name

usamah

Last Name

bennail

MiddleName

Amara

Affiliation

TRIPOLI-LIBYA

Email

osa_om_74@yahoo.com

City

TRIPOLI

Orcid

-

Volume

56

Article Issue

2

Related Issue

39192

Issue Date

2023-01-01

Receive Date

2022-11-02

Publish Date

2023-01-01

Page Start

122

Page End

126

Print ISSN

1110-0451

Online ISSN

2090-4258

Link

https://ajnsa.journals.ekb.eg/article_282328.html

Detail API

https://ajnsa.journals.ekb.eg/service?article_code=282328

Order

18

Type

Original Article

Type Code

455

Publication Type

Journal

Publication Title

Arab Journal of Nuclear Sciences and Applications

Publication Link

https://ajnsa.journals.ekb.eg/

MainTitle

IRT-1 Research Reactor Decommissioning Preliminary Plan

Details

Type

Article

Created At

23 Dec 2024