Beta
49922

A HEURISTIC PROJECT SCHEDULING APPROACH

Article

Last updated: 30 Jan 2023

Subjects

-

Tags

-

Abstract

This work documents a conventional heuristic project scheduling .approach for solving multiple resource-constrained project scheduling problems. Thus, the intent of this paper, is to demonstrate the design aspects of a suggested heuristic approach for resource leveling to projects scheduling under limited resource availabilities, The typical characteristics of the suggested heuristic procedure are:
a- Resource leveling program utilizes the parallel approach.
b- Multi-resource constrained with variable, resource availabilities.
c- Make use of different priority rules
d- Possibility of activity splitting Test problem results are represented

DOI

10.21608/amme.1984.49922

Authors

First Name

M.

Last Name

El Kadeem

MiddleName

A.

Affiliation

Prof. and Head of Prod. Eng. Dept.,Alexandria University.

Email

-

City

-

Orcid

-

First Name

M.

Last Name

El Dardiry

MiddleName

A.

Affiliation

Assist. Prof., Prod. Eng. Dept., Alexandria University.

Email

-

City

-

Orcid

-

First Name

S.

Last Name

Moussad

MiddleName

A.

Affiliation

Assist. Lecturer, Prod. Eng. Dept., Alexandria University.

Email

-

City

-

Orcid

-

Volume

2

Article Issue

1st Conference on Applied Mechanical Engineering.

Related Issue

7654

Issue Date

1984-05-01

Receive Date

2019-09-26

Publish Date

1984-05-01

Page Start

89

Page End

104

Print ISSN

2636-4352

Online ISSN

2636-4360

Link

https://amme.journals.ekb.eg/article_49922.html

Detail API

https://amme.journals.ekb.eg/service?article_code=49922

Order

45

Type

Original Article

Type Code

831

Publication Type

Journal

Publication Title

The International Conference on Applied Mechanics and Mechanical Engineering

Publication Link

https://amme.journals.ekb.eg/

MainTitle

-

Details

Type

Article

Created At

22 Jan 2023