A multi- channel queuing model: A Simulation Approach
Last updated: 31 Oct 2024
A multi- channel queuing model: A Simulation Approach
AlWalid ElSherif
03-1969
The problem: Consider a manufacturing facility for the production of a product consisting of three components. The system has the following configurations: 1- the components are produced in three separate processes, each of which is characterized by stochastic process times. 2- the time interval between the arrival of orders at the manufacturing facility is a random variable.
Eng
The Institute of National Planning
سلسلة مذكرات خارجية رقم (873)
Book
Details
Type
INP Report
Created At
31 Oct 2024