CAUSES OF DELAY AND COST OVERRUN FOR EDUCATIONAL BUILDING PROJECTS IN EGYPT

Article

Last updated: 13 Dec 2022

Subjects

-

Tags

Time Overrun
Cost Overrun
RII
Educational Building Projects
Egypt
CAUSES OF DELAY AND COST OVERRUN FOR EDUCATIONAL BUILDING PROJECTS IN EGYPT
2nd International Conference on Civil Engineering: Recent Applications and Future Challenges
Structural and Construction Engineering

Abstract

The construction industry is considered one of the most important industries in Egypt. The majority of construction projects are known to have time delays and cost overruns. The research main objective is to identify the causes of delay and cost overrun in educational building projects in Egypt and evaluate their importance by the main project stakeholders (Consultants, Contractors, and Owners). This objective was accomplished by means of an extensive literature review and a questionnaire-based survey. Forty causes of delay and cost overrun were gathered through the literature review and categorized into seven groups. The questionnaire was divided into three sections; the main section concentrated on the causes of delay and cost overrun in construction projects. Responses were gathered from 130 participants representing the key stakeholders participated in the project's construction. The analysis was conducted to determine the amount of delay and cost overrun experienced by the projects, in addition to the indices concerning the frequency of occurrence, impact on time and cost, and significance of the seven groups. As well, a ranking of the forty causes was performed to identify the most critical causes of delay and cost overrun in each type of educational building projects (public schools, private schools, public universities, and private universities). Concluded that the most common causes of delay and cost overrun between all types are: Price instability, Price escalation of material, delays in contractor's progress payment, financial problems, and contractor's difficulties in financing the project.

Categories

Structural and Construction Engineering

Keywords

Time Overrun, Cost Overrun, RII, Educational Building Projects, Egypt

Authors

First Name

mohamed

Last Name

gebrel

Affiliation

civil engineering department, faculty of engineering, sohag university

Email

-

City

-

Orcid

-

First Name

kamal

Last Name

assaf

Affiliation

Civil Engineering Department, Assuit University Assuit, Egypt

Email

-

City

-

Orcid

-

First Name

Alaa

Last Name

mohamed

Affiliation

Civil engineering department, faculty of engineering, Assiut university

Email

-

City

-

Orcid

-

First Name

Moataz

Last Name

Farag

Affiliation

Civil engineering department, faculty of engineering, Minia university

Email

-

City

-

Orcid

-

Volume

ICCE2021 Vol. 2

Issue Date

1 Jan 2021

Publish Date

4 Feb 2022

Link

https://icce2021.conferences.ekb.eg/article_1224.html

Order

33

Publication Type

Conference

Publication Title

2nd International Conference on Civil Engineering: Recent Applications and Future Challenges

Publication Link

https://icce2021.conferences.ekb.eg/

Details

Type

Article

Locale

en

Created At

13 Dec 2022