Evaluation of Different Scheduling Techniques Used for Infrastructure Projects
Last updated: 29 Mar 2025
10.21608/erjsh.2024.322873.1355
Decision support system, Network based techniques, Graphical based techniques, Critical Path Method (CPM), Infrastructure projects
Mohamed
Emam
Hassan
Civil Engineering Department, Faculty of Engineering at Shoubra, Benha University, Cairo, Egypt.
mohamed.hassan.asha@gmail.com
Sahar
Hasan
Shahat
Construction and Project Management Research Institute, Housing and Building National Research Center (HBRC), Cairo, Egypt.
eng_sahar5@yahoo.com
Shady
Dokhan
Ahmed
Civil Engineering Department, Faculty of Engineering at Shoubra, Benha University, Cairo, Egypt.
shady.ahmed@feng.bu.edu.eg
Neveen
Abdel Meged
Badawy
Civil Engineering Department, Faculty of Engineering at Shoubra, Benha University, Cairo, Egypt.
nevine.badawi@feng.bu.edu.eg
0000-0002-6585-343X
54
1
53999
2025-01-01
2024-09-25
2025-01-01
131
144
3009-6049
3009-6022
https://erjsh.journals.ekb.eg/article_401382.html
http://journals.ekb.eg?_action=service&article_code=401382
401,382
Research articles
2,276
Journal
Engineering Research Journal (Shoubra)
https://erjsh.journals.ekb.eg/
Evaluation of Different Scheduling Techniques Used for Infrastructure Projects
Details
Type
Article
Created At
29 Mar 2025