Beta
391758

Risk assessment during construction stage for the heritage buildings rehabilitation in Egypt

Article

Last updated: 29 Dec 2024

Subjects

-

Tags

-

Abstract

The objective of this research is to create a comprehensive risk assessment framework for the restoration stage of heritage building rehabilitation in Egypt. Forty-two primary risk factors were gathered from various sources including literature, site visits, and stakeholder interviews conducted during the restoration stage of the Amr ibn al-Aas mosque and Kom el-Shoqafa Cemetery in Alexandria. An online questionnaire was created, and the data was analyzed utilizing IBM SPSS version 20. The top risk factors identified were collapse of the heritage building due to design/construction errors, falling the labors from heights, falling materials due to the building's structural weaknesses and old artistic components, causing irreparable damage while trying to restore the Heritage building, collapse of scaffolding used, fire accidents of timber buildings, assigning design tasks to unqualified designers, insufficient awareness and lack of qualifications, skills, and experience of the contractor, using inappropriate methods, selecting unsuitable materials, inadequate qualification and supervision of the owner's engineer, lack of skilled labor, poor communication between design team & construction team, poor quality control, lake of installing safety measures, lack of availability of the proper materials, using low quality materials, excavation and using heavy equipment near the rehabilitated building, lack of understanding the project scope and objectives by the contractor, and inability to determine the accurate scope of work

DOI

10.21608/erjsh.2024.319659.1351

Keywords

Heritage Buildings, Rehabilitation, Risk assessment, conservation, Environment Heritage

Authors

First Name

Mahitab

Last Name

Ibrahim

MiddleName

magdy

Affiliation

Civil Engineering Department, Faculty of Engineering at Shoubra, Benha University, Egypt

Email

mahitab.magdy.asha@gmail.com

City

-

Orcid

-

First Name

mohamed

Last Name

abdelhamid

MiddleName

-

Affiliation

Civil Engineering Department, Faculty of Engineering at Shoubra, Benha University, Egypt

Email

mhamid01@gmail.com

City

cairo

Orcid

-

First Name

Khaled

Last Name

Abdelhady

MiddleName

-

Affiliation

Architecture Engineering Department, Faculty of Engineering at Shoubra, Benha University, Egypt

Email

id_abdelhady2@yahoo.com

City

-

Orcid

-

First Name

Tarek

Last Name

Attaia

MiddleName

-

Affiliation

Construction Engineering and Management Institute, Housing and Building National Research Center (HBRC), Egypt

Email

tarek_attia@yahoo.comd

City

-

Orcid

-

Volume

53

Article Issue

4

Related Issue

51476

Issue Date

2024-10-01

Receive Date

2024-09-11

Publish Date

2024-11-01

Page Start

1

Page End

12

Print ISSN

3009-6049

Online ISSN

3009-6022

Link

https://erjsh.journals.ekb.eg/article_391758.html

Detail API

https://erjsh.journals.ekb.eg/service?article_code=391758

Order

391,758

Type

Research articles

Type Code

2,276

Publication Type

Journal

Publication Title

Engineering Research Journal (Shoubra)

Publication Link

https://erjsh.journals.ekb.eg/

MainTitle

Risk assessment during construction stage for the heritage buildings rehabilitation in Egypt

Details

Type

Article

Created At

29 Dec 2024