Beta
292121

Methodology of TPM to Increase the Performance & Productivity of Banknote Processing Machines.

Article

Last updated: 28 Dec 2024

Subjects

-

Tags

Mechatronics Engineering

Abstract

 Maintenance is an important practice that is used for servicing, repairing and replacing of faulty
equipment Maintenance includes but not limited to all actions taken to preserve and retain equipment in
serviceable condition, routine work to make sure that the facility works at its designed conditions or
capacity, and any activity including testing, measuring, or adjustments. Almost all facilities apply
maintenance in their premises to enhance lifetime and productivity. Total productive maintenance (TPM) is a
comprehensive path from senior management to those involved in equipment maintenance activities. This
paper presents the application of TPM methodology (including 8 pillars) at The Central Bank of Egypt
(CBE), to increase the performance and productivity of the banknote processing machines. In addition to
discusses autonomous maintenance pillar. Since CBE has a large variety of instruments and equipment, it ‘ll
pave the way for other facilities to follow. The results which uses Overall Equipment Effectiveness (OEE),
are compared and concluded.

DOI

10.21608/msaeng.2023.292121

Keywords

Preventive Maintenance (PM), Total productive maintenance (TPM), Autonomous Maintenance (AM), Central Bank of Egypt (CBE) and Overall Equipment Effectiveness (OEE)

Authors

First Name

ahmed

Last Name

Farouq

MiddleName

khaled

Affiliation

Mechatronics, Engineering, Arab academy for science, technology and maritime transport,Cairo,Egypt

Email

ahmed.khaled.farouq33@gmail.com

City

cairo

Orcid

-

First Name

Mahmoud

Last Name

Sayed

MiddleName

Mohamed

Affiliation

Vice Dean in Higher institute of Engineering and Technology for Automotive & Energy,cairo,Egypt

Email

mahsayed42@gmail.com

City

cairo

Orcid

-

First Name

Mostafa

Last Name

Atia

MiddleName

-

Affiliation

Mechanical engineering department, Arab Academy for science technology & maritime Transport,Cairo, Egypt

Email

mrostom1@aast.edu

City

cairo

Orcid

-

Volume

2

Article Issue

2

Related Issue

40382

Issue Date

2023-03-01

Receive Date

2023-03-25

Publish Date

2023-03-01

Page Start

1,173

Page End

1,188

Print ISSN

2812-5339

Online ISSN

2812-4928

Link

https://msaeng.journals.ekb.eg/article_292121.html

Detail API

https://msaeng.journals.ekb.eg/service?article_code=292121

Order

292,121

Type

Original Article

Type Code

2,183

Publication Type

Journal

Publication Title

MSA Engineering Journal

Publication Link

https://msaeng.journals.ekb.eg/

MainTitle

Methodology of TPM to Increase the Performance & Productivity of Banknote Processing Machines.

Details

Type

Article

Created At

28 Dec 2024