The impact of successful communication between stakeholders at the design phase, using Integrated Project Delivery (IPD) method, on construction industry
Last updated: 28 Dec 2024
10.21608/ijaeur.2024.241273.1051
project delivery system, integrated project delivery, Building information modeling, time schedule, stakeholders
Hossam
Youssef
Adel
Architecture Engineering Department, Faculty of Eng., Ain- shams University, Cairo, Egypt.
hosam.ward17@gmail.com
6
2
45386
2023-12-01
2023-10-08
2023-12-01
181
203
2785-9665
2785-9673
https://ijaeur.journals.ekb.eg/article_336451.html
https://ijaeur.journals.ekb.eg/service?article_code=336451
336,451
Original Article
1,955
Journal
International Journal of Architectural Engineering and Urban Research
https://ijaeur.journals.ekb.eg/
The impact of successful communication between stakeholders at the design phase, using Integrated Project Delivery (IPD) method, on construction industry
Details
Type
Article
Created At
28 Dec 2024