Technical Requirements of Connecting Wind Farms to the Egyptian Grid Based on the Wind Farm Grid Connection Code

Article

Last updated: 28 Dec 2024

Subjects

-

Tags

-

Abstract

The objective of this article is to provide the basic information on the technical design specifications and criteria, technical terms and equipment parameters appeared in the wind farm grid connection code. For example, power quality issues, their cause and impact on the system performances, as referred to in the codes, will be discussed and explained. The technical specifications include permitted voltage and frequency variations in addition to power quality measures such as limits of harmonic distortion, phase unbalance, and flickers. Wind turbine generating unit operational limits, capability requirements, active power and frequency control, reactive power and voltage control, power factor, etc. will be explained and discussed. The article provides an updated summary of invited tutorials on codes presented at national and international conferences [1]-[3].

Authors

First Name

عمر

Last Name

عبد الله

MiddleName

حنفى

Affiliation

Fellow of ESE, Helwan University

Email

ohabdalla@ieee.org

City

cairo

Orcid

-

Volume

62

Article Issue

1

Related Issue

42934

Issue Date

2023-08-01

Receive Date

2023-06-03

Publish Date

2023-08-16

Page Start

35

Page End

16

Print ISSN

1110-1253

Online ISSN

2735-5500

Link

https://egsen.journals.ekb.eg/article_313164.html

Detail API

https://egsen.journals.ekb.eg/service?article_code=313164

Order

313,164

Publication Type

Journal

Publication Title

Journal of the Egyptian Society of Engineers

Publication Link

https://egsen.journals.ekb.eg/

MainTitle

Technical Requirements of Connecting Wind Farms to the Egyptian Grid Based on the Wind Farm Grid Connection Code

Details

Type

Article

Created At

28 Dec 2024