Relative Efficiency of the Maximum Product Spacing Estimates of the Power Topp-Leone Distribution Parameters under Progressive Type-II Censoring Scheme
Last updated: 04 Jan 2025
10.21608/fsrt.2023.193518.1084
The power Topp-Leone distribution, Maximum likelihood estimation, maximum product spacing estimation, progressive Type-II censoring scheme, Markov Chain Monte Carlo technique
Mohamed
Ahmed
Ali
Department of Statistics, Mathematics and Insurance, Al Madina Higher Institute of Management and Technology, Giza, Egypt.
mohamed.ali@sci.suezuni.edu.eg
Giza
6
1
42855
2023-08-01
2023-02-13
2023-08-01
2682-2962
2682-2970
https://fsrt.journals.ekb.eg/article_292998.html
https://fsrt.journals.ekb.eg/service?article_code=292998
292,998
Original Article
1,029
Journal
Frontiers in Scientific Research and Technology
https://fsrt.journals.ekb.eg/
Relative Efficiency of the Maximum Product Spacing Estimates of the Power Topp-Leone Distribution Parameters under Progressive Type-II Censoring Scheme
Details
Type
Article
Created At
24 Dec 2024