393542

Using Earned Value Management and Value Engineering tools to enhance system’s productivity, A proposed Framework.

Article

Last updated: 04 Jan 2025

Subjects

-

Tags

-

Abstract

Abstract
In today's highly competitive business landscape, enhancing productivity and optimizing resource allocation are critical for a firm's success. This paper presents a comprehensive framework that uses Earned Value Management (EVM) and Value Engineering (VE) to achieve these goals. The proposed framework consists of five key phases: Initiation and Planning, Value Engineering Analysis, Implementation of EVM, Monitoring and Control, and Continuous Improvement. By creating constructive collaboration between EVM's data-driven insights and VE's innovative approaches, the framework aims to maximize project efficiency, reduce costs, and enhance overall productivity. This comprehensive approach not only ensures that projects are completed on time and within budget but also fosters a culture of continuous improvement, positioning firms for sustained success in a dynamic market environment. The proposed framework enabled us to achieve enhancements in productivity costs ranging from 66% to 90%; moreover, we achieved total working man-hour savings ranging from 33% to 88.7% across different disciplines.

DOI

10.21608/erj.2024.307868.1080

Keywords

Keywords: Earned Value Management, Earned Value, value engineering, value management

Authors

First Name

Arafa

Last Name

Sobh

MiddleName

-

Affiliation

Industrial Engineering Program, Engineering of Applied Science, Nile University

Email

arsoliman@nu.edu.eg

City

-

Orcid

-

First Name

Shaimaa

Last Name

Darwish

MiddleName

-

Affiliation

Industrial Engineering, Helwan Faculty of Engineering, Helwan university, Helwan, Egypt

Email

shaimaa.abdullah.348@h-eng.helwan.edu.eg

City

-

Orcid

-

First Name

Mohamed

Last Name

Etman

MiddleName

-

Affiliation

Mechanical Engineering Department, Faculty of Engineering, Helwan University, Cairo, Egypt

Email

eng.mep.bim@gmail.com

City

-

Orcid

-

First Name

Abdullah

Last Name

Elfar

MiddleName

-

Affiliation

Department of Industrial Engineering, Imam Mohammad Ibn Saud Islamic University (IMSIU)

Email

aaelfar@imamu.edu.sa

City

-

Orcid

-

Volume

183

Article Issue

4

Related Issue

50399

Issue Date

2024-12-01

Receive Date

2024-07-28

Publish Date

2024-12-01

Page Start

1

Page End

23

Print ISSN

1110-5615

Link

https://erj.journals.ekb.eg/article_393542.html

Detail API

https://erj.journals.ekb.eg/service?article_code=393542

Order

1

Type

Original Article

Type Code

998

Publication Type

Journal

Publication Title

Engineering Research Journal

Publication Link

https://erj.journals.ekb.eg/

MainTitle

Using Earned Value Management and Value Engineering tools to enhance system’s productivity, A proposed Framework.

Details

Type

Article

Created At

24 Dec 2024