IMPACT OF PROJECT DELIVERY METHODS ON LIFECYCLE RISK MANAGEMENT OF OFFSHORE PROJECTS

Article

Last updated: 24 Dec 2024

Subjects

-

Tags

Civil Engineering

Abstract

Offshore projects are complex and require proactive risk management to achieve the desired outcomes. Offshore projects are exposed to many risks due to the large investments, strict regulations, and complex natural challenges. This study highlights the importance of risk management in offshore project execution, focusing on the risks associated with different project delivery methods(PDMs) such as Design Bid Build (DBB), Design-Build (DB), Construction Management at Risk (CMAR), Public-Private Partnership (PPP), Build-Operate-Transfer (BOT), Engineering, procurement and Construction(EPC) and Integrated Project Delivery (IPD) at various stages of an offshore project's lifecycle. This research aims to assess and recognize the risks related to offshore projects to improve understanding and optimize performance outcomes. Risk identification was carried out through an extensive literature review followed by a risk assessment involving expert interviews to evaluate the probability and impact of each risk. It is found that management risks account for an average of 52% of all identified risks, While technical risks account for an average of 24% of the identified risks. Historical data on real-world projects delivered using EPC are utilized to validate these risks' impact on the risk management process by assessing pre-mitigation and post-mitigation risk plans. It is noted that implementing a risk response strategy led to a 27% reduction in the estimated budget and a 14% decrease in the estimated duration.

DOI

10.21608/pserj.2024.302206.1351

Keywords

Offshore, Projects Delivery Methods, Risk Management, Project’s Life cycle

Authors

First Name

Ibrahim

Last Name

Mahdi

MiddleName

-

Affiliation

Professor of Project management, Structural Engineering and Construction Management Department , Faculty of Engineering and Technology, Future University in Egypt

Email

ibrahim.mahdy@fue.edu.eg

City

-

Orcid

-

First Name

Ahmed M. Ebid

Last Name

M. Ebid

MiddleName

-

Affiliation

Associate Professor, Structural Engineering and Construction Management Department, Faculty of Engineering and Technology, Future University in Egypt

Email

ahmed.abdelkhaleq@fue.edu.eg

City

-

Orcid

-

First Name

Hassan

Last Name

Ghatass

MiddleName

-

Affiliation

Professor of Concrete Structures, Civil Engineering Department, Faculty of Engineering, Port Said University, Port Said, Egypt

Email

hi_hgh@yahoo.com

City

-

Orcid

0000-0003-1653-5176

First Name

Ehab

Last Name

Tolba

MiddleName

-

Affiliation

Professor of Ports and Coastal Engineering, Civil Engineering Department, Faculty of Engineering, Port Said University port-fouad

Email

prof.tolba@gmail.com

City

-

Orcid

-

First Name

Lamisse

Last Name

Hussein

MiddleName

Raed

Affiliation

Civil engineering Department, Faculty of engineering ,port said university ,Port said,Egypt

Email

lamees.raad@eng.psu.edu.eg

City

-

Orcid

-

Volume

28

Article Issue

4

Related Issue

51962

Issue Date

2024-12-01

Receive Date

2024-07-07

Publish Date

2024-12-01

Page Start

15

Page End

24

Print ISSN

1110-6603

Online ISSN

2536-9377

Link

https://pserj.journals.ekb.eg/article_368982.html

Detail API

https://pserj.journals.ekb.eg/service?article_code=368982

Order

368,982

Type

Original Article

Type Code

813

Publication Type

Journal

Publication Title

Port-Said Engineering Research Journal

Publication Link

https://pserj.journals.ekb.eg/

MainTitle

IMPACT OF PROJECT DELIVERY METHODS ON LIFECYCLE RISK MANAGEMENT OF OFFSHORE PROJECTS

Details

Type

Article

Created At

24 Dec 2024