Beta
389734

MEASURING THE FACTORS AFFECTING CONSTRUCTION METHOD SELECTION: A CASE STUDY EGYPT

Article

Last updated: 24 Dec 2024

Subjects

-

Tags

Civil engineering

Abstract

Selecting an appropriate construction method is considered to be a persistent need to save cost, time and achieve high quality for construction projects. Especially as the selection depends on many complex manifold factors that affect project cost, time and quality. In addition to, the great calamities which happened latterly in the world such as covid-19 pandemic, inflation, resource depletion and prices rising which definitely affects construction industry. Wherefore it's momentous to measure the factors affecting construction method selection, to facilitate decision making in project's early study stages such as feasibility study stage or scheme stage to avoid its negative influences. Therefore, this research aims to explore and measure the factors affecting construction method selection for residential buildings in Egypt to facilitate decision making process, especially in current time that witness revolution in construction and difficult economic conditions. The exploring and measuring process will be based on three construction methods which are conventional construction, prefabricated on-site and prefabricated off-site. The results achieved by this research found that, there are eight main factors affecting construction method selection, three related to construction cost, three related to construction time and two related to construction quality. Moreover, the results showed that the factors related to construction cost and time were the extreme factors that affecting construction method selection.

DOI

10.21608/auej.2024.290102.1664

Keywords

Construction method, conventional method, prefabricated method, Decision Making, Delphi method

Authors

First Name

Ahmed

Last Name

Zaki

MiddleName

Fathi

Affiliation

Construction & Building Engineering Department, College of Engineering and Technology Arab Academy for Science, Technology & Maritime Transport, Alexandria, Egypt

Email

eng.afz80@gmail.com

City

Alex

Orcid

-

First Name

Elbadr

Last Name

Elgendi

MiddleName

-

Affiliation

Construction & Building Engineering Department, College of Engineering and Technology Arab Academy for Science, Technology & Maritime Transport, Alexandria, Egypt

Email

elbadrosman@aast.edu

City

-

Orcid

-

First Name

Nabil

Last Name

El Ashkar

MiddleName

-

Affiliation

Construction & Building Engineering Department, College of Engineering and Technology Arab Academy for Science, Technology & Maritime Transport, Alexandria, Egypt

Email

nelashkar@aast.edu

City

-

Orcid

-

Volume

19

Article Issue

73

Related Issue

51474

Issue Date

2024-10-01

Receive Date

2024-05-16

Publish Date

2024-10-01

Page Start

1,298

Page End

1,304

Print ISSN

1687-8418

Online ISSN

3009-7622

Link

https://jaes.journals.ekb.eg/article_389734.html

Detail API

https://jaes.journals.ekb.eg/service?article_code=389734

Order

389,734

Type

Original Article

Type Code

706

Publication Type

Journal

Publication Title

Journal of Al-Azhar University Engineering Sector

Publication Link

https://jaes.journals.ekb.eg/

MainTitle

MEASURING THE FACTORS AFFECTING CONSTRUCTION METHOD SELECTION: A CASE STUDY EGYPT

Details

Type

Article

Created At

24 Dec 2024