Poor cost performance is a typical problem in construction projects where few projects were completed 
within the original estimated cost. The previous researches (literature) show that up to 90% of construction projects 
suffer cost overrun with amounts ranged from 5% to 200%. This paper first utilizes a literature review to identify 
cost overrun causes and categorizes such causes based on stakeholder, country, and project type. Secondly, an indepth review was conducted to identify the contractors' cost overrun root causes. Thirdly, contractors' gaps and 
shortage of cost management processes have been identified. Finally, guidelines were concluded to resolve the 
identified gaps and enhance cost performance. The research conclusions depict that the top five cost overrun causes 
were inflation and fluctuation of construction resources, inaccurate cost estimates, poor cost control, poor owners' 
financial status, and work scope change. In addition, this research manifests that two top contractors' related cost 
overrun factors, inaccurate cost estimate, and poor cost control, were deemed the main elements of the cost 
management system. Another major contribution of this research is addressing the gaps in cost management 
processes to pave the way for future studies on identified gaps

DOI

10.21608/erjsh.2022.249998

Keywords

Cost Overrun, Cost Management, Cost Estimation, and Cost Control

Authors

First Name

Mohamed

Last Name

Abdel-Monem

MiddleName

-

Affiliation

Civil Eng. Department, Faculty of Engineering, Shoubra, Benha University, Cairo, Egypt.

Email

-

City

-

Orcid

-

First Name

Abdel-Rahman

Last Name

El-Mohr

MiddleName

-

Affiliation

Civil Eng. Department, Faculty of Engineering, Shoubra, Benha University, Cairo, Egypt

Email

-

City

-

Orcid

-

First Name

Karim

Last Name

El-Dash

MiddleName

-

Affiliation

Faculty of Engineering, Misr University for Science and Technology, Cairo, Egypt.

Email

-

City

-

Orcid

-

Volume

51

Article Issue

3

Related Issue

33920

Issue Date

2022-07-01

Receive Date

2022-07-20

Publish Date

2022-07-01

Page Start

76

Page End

97

Print ISSN

1687-1340

Link

https://erjsh.journals.ekb.eg/article_249998.html

Detail API

https://erjsh.journals.ekb.eg/service?article_code=249998

Order

249,998

Type

Review Articles

Type Code

2,277

Publication Type

Journal

Publication Title

Engineering Research Journal - Faculty of Engineering (Shoubra)

Publication Link

https://erjsh.journals.ekb.eg/

MainTitle

-

Details

Type

Article

Created At

23 Jan 2023