SIMULATION MODELING OF PRODUCTION LINES: A CASE STUDY OF CEMENT PRODUCTION LINE
Last updated: 04 Jan 2025
10.21608/jesaun.2013.114780
Production Lines, Buffer allocation, Simulation, Cement industry
M.
Heshmat
Mechanical Engineering Department – Faculty of Engineering, Assiut University, 71516 Assiut
mhmdheshmat@gmail.com
M. A.
El-Sharief
Mechanical Engineering Department – Faculty of Engineering, Assiut University, 71516 Assiut
M. G.
El- Sebaie
Mechanical Engineering Department – Faculty of Engineering, Assiut University, 71516 Assiut
41
No 3
16851
2013-05-01
2012-12-03
2013-05-01
1,045
1,053
1687-0530
2356-8550
https://jesaun.journals.ekb.eg/article_114780.html
https://jesaun.journals.ekb.eg/service?article_code=114780
14
Research Paper
1,438
Journal
JES. Journal of Engineering Sciences
https://jesaun.journals.ekb.eg/
SIMULATION MODELING OF PRODUCTION LINES: A CASE STUDY OF CEMENT PRODUCTION LINE
Details
Type
Article
Created At
23 Jan 2023