BURR FORMATION IN ALUMINUM AND STEEL HOLES DRILLED BY A BENCH DRILL WITH A SPINDLE-MOUNTED SPRING
Last updated: 26 Dec 2024
10.21608/jesaun.2013.114775
burr, formation, drilling process
M. A. A.
El-Gendy
Director, Labor University workshops, Assiut, Egypt
maaelgendy74@yahoo.com
A. A.
Nasr
Mechanical Engineering Department, Faculty of Engineering, Assiut University
Mahmoud A.
El-Sharief
Mechanical Engineering Department, Faculty of Engineering, Assiut University
41
No 3
16851
2013-05-01
2012-07-21
2013-05-01
930
946
1687-0530
2356-8550
https://jesaun.journals.ekb.eg/article_114775.html
https://jesaun.journals.ekb.eg/service?article_code=114775
9
Research Paper
1,438
Journal
JES. Journal of Engineering Sciences
https://jesaun.journals.ekb.eg/
BURR FORMATION IN ALUMINUM AND STEEL HOLES DRILLED BY A BENCH DRILL WITH A SPINDLE-MOUNTED SPRING
Details
Type
Article
Created At
23 Jan 2023