Beta
185333

Expected Costs for Service Interruption.

Article

Last updated: 22 Jan 2023

Subjects

-

Tags

Electrical Engineering

Abstract

 
This paper introducs a mathematical model for expecting the value of cost of service interruptions. Since, this cost is affected mainly by reliability level of the power system, the forced and scheduled outages for the different elements are considered. Mathematical relations for the determination of reliability indices are derviated and the factors affecting these reliability indices are studied. Then relations relating the expected cost of service interruption and reliability indices are proposed. 
 
 
 

DOI

10.21608/bfemu.2021.185333

Authors

First Name

Mohamed

Last Name

Mohamed Tantawy

MiddleName

Abd El-Moniem

Affiliation

Assistant Professor., Electrical Power & Machines Department., Faculty of Engineering., El-Mansoura University., Mansoura., Egypt.

Email

mtantawi@mans.edu.eg

City

Mansoura

Orcid

-

First Name

M.

Last Name

El-Arab

MiddleName

A.

Affiliation

Faculty of Engineering., El-Monofia University

Email

-

City

-

Orcid

-

Volume

2

Article Issue

1

Related Issue

26755

Issue Date

1977-06-01

Receive Date

1977-04-16

Publish Date

2021-07-25

Page Start

58

Page End

66

Print ISSN

1110-0923

Online ISSN

2735-4202

Link

https://bfemu.journals.ekb.eg/article_185333.html

Detail API

https://bfemu.journals.ekb.eg/service?article_code=185333

Order

10

Type

Research Studies

Type Code

1,205

Publication Type

Journal

Publication Title

MEJ. Mansoura Engineering Journal

Publication Link

https://bfemu.journals.ekb.eg/

MainTitle

-

Details

Type

Article

Created At

22 Jan 2023