Beta
187201

Effect of Load Uncertainty Economical Load Scheduling.

Article

Last updated: 22 Jan 2023

Subjects

-

Tags

Electrical Engineering

Abstract

Among the input data required for systems economically lead scheduling is the forecasted load . The uncertainty in forecasted load is of the main factors affecting economical load scheduling (E.L.S.) problems.
This paper presents the solution of E.L.S. problem for electrical power systems. The plants limitations , demand and transmission constraints are of the factors considered. Factors influencing forecasted load load uncertainty are illustrated. Mathematical formulation and comprehensive analysis for corrections must be made to E.L.S. due to incremental load chaages are introduced.  
 

DOI

10.21608/bfemu.2021.187201

Authors

First Name

Mohamed

Last Name

Mohamed Tantawy

MiddleName

Abd El-Moniem

Affiliation

Associate Professor., Electrical Power & Machines Department., Faculty of Engineering., El-Mansoura University., Mansoura., Egypt.

Email

mtantawi@mans.edu.eg

City

Mansoura

Orcid

-

Volume

4

Article Issue

1

Related Issue

26312

Issue Date

1979-06-01

Receive Date

1979-04-16

Publish Date

2021-08-03

Page Start

105

Page End

113

Print ISSN

1110-0923

Online ISSN

2735-4202

Link

https://bfemu.journals.ekb.eg/article_187201.html

Detail API

https://bfemu.journals.ekb.eg/service?article_code=187201

Order

32

Type

Research Studies

Type Code

1,205

Publication Type

Journal

Publication Title

MEJ. Mansoura Engineering Journal

Publication Link

https://bfemu.journals.ekb.eg/

MainTitle

-

Details

Type

Article

Created At

22 Jan 2023