Beta
169624

Using Multiple Objective Techniques to Model Hierarchical Production Planning (HPP) Problems (Part 1: Theoritical Study).

Article

Last updated: 22 Jan 2023

Subjects

-

Tags

Electrical Engineering

Abstract

This paper proposes a new approach for solving the production planning and scheduling problem called "Goal Programming adproach to Hierarchical Production Planning". This approach combines the attractive feature of both goal programming as a powerful tool for multi-objective analysis and the hierachical system as an effective framework for decision making in a single-stage batch pro cessing environment. 
The proposed procedure assumes that there are two levels of the pro duct aggregation in the production structure from the Hax and Meal framework [8]. Production items may be aggregated into families and families aggregated into types. Type is a collection of items that have the same demand pattern, the same unit costs, direct costs (excluding labour costs), holding costs per unit per period, and the production time required per unit. A family is a set of items within a type such that the items share a common setup. This form of aggregation may result in partitioning the production planning and scheduling problem into two subproblems in a hierarchy. The two subproblems are the aggregation production planning subproblem and the family disaggregation subproblem. The aggregation production planning subproblem, the highest level of planning in the hierarchical system, is concerned with the effective allocation of production resoures amongst product types to satisfy demand over a specified planning horizon. Typical decisions to be made at this level are the determination of production and inventory levels for each product type and regular and overtime workforce levels in each time period. The family diaggregation subproblem, the second level of planning, is concerned with the disaggregation of aggregate production plan for each type into production schedules for families belonging to that type over a short scheduling horizon. Typical decisions to be made at this level are the determination of production and inventory levels for each family within a type in each time period in the scheduling horizon. 

DOI

10.21608/bfemu.1991.169624

Authors

First Name

M.

Last Name

Rasmy

MiddleName

H.

Affiliation

Operations Research Program ISSR., Cairo University.

Email

-

City

Cairo

Orcid

-

First Name

S.

Last Name

Ismail

MiddleName

-

Affiliation

Central Bank., Cairo.

Email

-

City

Cairo

Orcid

-

Volume

16

Article Issue

1

Related Issue

24660

Issue Date

1991-05-01

Receive Date

1991-01-09

Publish Date

2021-05-01

Page Start

132

Page End

149

Print ISSN

1110-0923

Online ISSN

2735-4202

Link

https://bfemu.journals.ekb.eg/article_169624.html

Detail API

https://bfemu.journals.ekb.eg/service?article_code=169624

Order

9

Type

Research Studies

Type Code

1,205

Publication Type

Journal

Publication Title

MEJ. Mansoura Engineering Journal

Publication Link

https://bfemu.journals.ekb.eg/

MainTitle

-

Details

Type

Article

Created At

22 Jan 2023