Beta
103102

Solving Unit Commitment Problem in Deregulated Power Systems Environment.

Article

Last updated: 04 Jan 2025

Subjects

-

Tags

Electrical Engineering

Abstract

With the fast-paced changing technologies in the power industry, new power references addressing new technologies are coming to the market. So there is an urgent need to keep track of international experiences and activities taking place in the field of modern unit-commitment (UC) problem. UC is a nonlinear mixed integer optimization problem to schedule the operation of the generating units at minimum operating cost while satisfying the demand and other equality and inequality constrains. The UC problem has to determine the on/off state of the generating units at each hour of the planning period and optimally dispatch the load among the committed units. UC is the most significant optimization task in the operation of the power systems. Solving the UC problem for large power systems is computationally expensive. The complexity of the UC problems grows exponentially with the number of generating units  especially by applying the deregulated rules in power system. Where in this environment the objective function is  maximizing the profit while satisfying the regular unit commitment constrains in addition to new constrains such as bilateral and multilateral contracts. So in this paper, an exact mathematical optimization procedure called “dynamic programming." is presented to solve of the UC problem in the deregulated environment. The proposed algorithm is implemented in MATLAB environment.

DOI

10.21608/bfemu.2020.103102

Keywords

Dynamic programming, (DP), Unit Commitment, Deregulation, generation companies (GENCOs), Independent System Operator (ISO), market clearing price(MCP), optimization methods, power generation dispatch

Authors

First Name

Sahar

Last Name

Kaddah

MiddleName

Sidky

Affiliation

Professor of Electrical Engineering Department., Faculty of Engineering., Mansoura University., Egypt, She is the Head of Electrical Engineering Department

Email

skaddah@mans.edu.eg

City

Mansoura

Orcid

-

First Name

Ragab

Last Name

El Sehiemy

MiddleName

A.

Affiliation

Electrical Engineering Department., Faculty of Engineering., Kafr Elsheikh University., Egypt.

Email

-

City

-

Orcid

-

First Name

Alaa

Last Name

Zaky

MiddleName

-

Affiliation

Electrical Engineering Department., Faculty of Engineering,. Kafr Elsheikh University., Egypt.

Email

-

City

-

Orcid

-

Volume

38

Article Issue

4

Related Issue

15577

Issue Date

2013-12-01

Receive Date

2013-03-05

Publish Date

2020-07-15

Page Start

1

Page End

14

Print ISSN

1110-0923

Online ISSN

2735-4202

Link

https://bfemu.journals.ekb.eg/article_103102.html

Detail API

https://bfemu.journals.ekb.eg/service?article_code=103102

Order

1

Type

Research Studies

Type Code

1,205

Publication Type

Journal

Publication Title

MEJ. Mansoura Engineering Journal

Publication Link

https://bfemu.journals.ekb.eg/

MainTitle

Solving Unit Commitment Problem in Deregulated Power Systems Environment.

Details

Type

Article

Created At

22 Jan 2023