Beta
162574

Comparison Between Systematical Budget Allocation Modeling Selection Methods in Low-Income Residential Rehabilitation Projects

Article

Last updated: 25 Dec 2024

Subjects

-

Tags

-

Abstract

One of the most important problems for governments and private sectors on construction industry is how to allocate budgets for public residential projects. Low-income residential projects in developing countries have major effects on implementing the principles of sustainable development. Limited budgets in concrete rehabilitation structures represent challenges for the decision-makers. The budget allocation methods proposed in this paper can be easily meet the actual changing demands of response budget policies. This paper proposed a comprehensive comparison between the Topsis method and Simo's ranking method in low-income residential rehabilitation projects. Also, the assignment problem presented to select a suitable project depending on the different clusters. This proposed comparative study aims the decision-maker (DM) to select the optimum method. Finally 13 criteria have been gathered from comprehensive literature. The gathered criteria have been reviewed through unstructured interviews with engineers work in the required field, and selective research according to the designed sample size. These criteria have been classified into three main clusters, economic aspects cluster, social aspects cluster, and environmental aspects cluster. Statistical analysis has been conducted on the interviews feedback. The research aims to trade-off in guiding the decision-maker to direct very limited budgets in the quality of restoration and rehabilitation the efficiency of low-cost or economic housing projects sustainably based on cost factors of projects.

DOI

10.21608/erjm.2021.51486.1055

Keywords

Rehabilitation, Budget allocation, TOPSIS, Hungarian method, the assignment problem

Authors

First Name

Ahmed

Last Name

Nouh Meshref

MiddleName

-

Affiliation

civil, Benha University, facuilty of engineering.

Email

dr.ahmednouh@bhit.bu.edu.eg

City

Cairo

Orcid

0000-0002-9861-542X

First Name

Mohamed

Last Name

A. Elsisy

MiddleName

-

Affiliation

Basic Engineering Sciences Department, Associate Professor , Benha Faculty of Engineering, Benha University, Benha 13512, Egypt.

Email

mohamedelsisy2@gmail.com

City

-

Orcid

-

Volume

44

Article Issue

2

Related Issue

23775

Issue Date

2021-04-01

Receive Date

2020-11-28

Publish Date

2021-04-01

Page Start

211

Page End

219

Print ISSN

1110-1180

Online ISSN

3009-6944

Link

https://erjm.journals.ekb.eg/article_162574.html

Detail API

https://erjm.journals.ekb.eg/service?article_code=162574

Order

9

Type

Original Article

Type Code

1,118

Publication Type

Journal

Publication Title

ERJ. Engineering Research Journal

Publication Link

https://erjm.journals.ekb.eg/

MainTitle

Comparison Between Systematical Budget Allocation Modeling Selection Methods in Low-Income Residential Rehabilitation Projects

Details

Type

Article

Created At

22 Jan 2023