Improve Implementing Mega Building Envelope upon arriving material using lean six sigma: case study
Last updated: 04 Jan 2025
10.21608/erj.2021.152757
Mega building envelope, implementation - upon arrive material, Process, Lean- Six Sigma - waste
Enass
Salama
Teacher assistant at Modern Academy for Engineering and Technology (Maadi)
Nesreen
Khalil
Associate. Professor, Architectural Dept, faculty of Engineering Matariya, Helwan University
169
0
20740
2021-03-01
2021-03-01
2021-03-01
30
50
1110-5615
https://erj.journals.ekb.eg/article_152757.html
https://erj.journals.ekb.eg/service?article_code=152757
3
Original Article
998
Journal
Engineering Research Journal
https://erj.journals.ekb.eg/
Improve Implementing Mega Building Envelope upon arriving material using lean six sigma: case study
Details
Type
Article
Created At
22 Jan 2023