Beta
74865

ENERGY REQUIREMENTS FOR OPERATING THE ROTARY PLOW UNDER EGYPTION CONDITIONS

Article

Last updated: 04 Jan 2025

Subjects

-

Tags

-

Abstract

The experiments were carried out at the farm of El-Gimmaza Research Station, El-Gharbia Governorate , on clayey soil . The field study was conducted to determined the energy requirements for operating the rotary plow as primary and secondary tillage machin under Egyption conditions . The results indicated that , the energy requirement for operating the chisel plow the equivalent of 67% from the energy requirement rotary plow  at the same operating speed and soil conditions .The rotary plow produce a suitable seedbed without a secondary tillage operation . Therefore , the use of rotary plow to prepare a suitable seedbed as secondary tillage need the energy equivalent to 82 % of the energy needed using the chisel plow for seedbed preparation.

DOI

10.21608/jssae.2010.74865

Authors

First Name

M.

Last Name

Abo-Habaga

MiddleName

M. E.

Affiliation

Agric. Engineering Dept., Faculty of Agric. Mansoura University

Email

-

City

-

Orcid

-

First Name

Kh.

Last Name

Khadr

MiddleName

A. A.

Affiliation

Agric. Engineering Research Institute, ARC.

Email

-

City

-

Orcid

-

First Name

O.

Last Name

Naeem

MiddleName

E. M. M.

Affiliation

Ministry of Agriculture

Email

-

City

-

Orcid

-

Volume

1

Article Issue

5

Related Issue

11280

Issue Date

2010-05-01

Receive Date

2010-05-10

Publish Date

2010-05-01

Page Start

463

Page End

473

Print ISSN

2090-3685

Online ISSN

2090-3766

Link

https://jssae.journals.ekb.eg/article_74865.html

Detail API

https://jssae.journals.ekb.eg/service?article_code=74865

Order

4

Type

Original Article

Type Code

889

Publication Type

Journal

Publication Title

Journal of Soil Sciences and Agricultural Engineering

Publication Link

https://jssae.journals.ekb.eg/

MainTitle

ENERGY REQUIREMENTS FOR OPERATING THE ROTARY PLOW UNDER EGYPTION CONDITIONS

Details

Type

Article

Created At

22 Jan 2023