Beta
44260

Time-Cost Tradeoff Problems Solutions for Construction Projects Using Integer Linear Programming.

Article

Last updated: 24 Dec 2024

Subjects

-

Tags

-

Abstract

Abstract:
Time-Cost Optimization (TCO) problem is one of the greatest challenges in construction project
planning and control. TCO may be defined as a process to identify suitable construction activit ies
for speeding up, and deciding “by how much" so as to attain the best possible savings in both time
and cost. In this paper, an Integer Linear Model is developed to obtain solutions of time -cost
tradeoff (TCT) problems in construction projects.
The proposed Model collects most related characteristics and constraints presented by different
previous works. Also, new factors have been added to the model so as to represents more real TCT
problems in life projects. The model is solved by Excel 2007 and verified using the commercial
package Primavera (P3) throughout an application example . Good agreement results of model
response against different related factors are founded through conducting sensitivity analysis.

DOI

10.21608/iccae.2012.44260

Keywords

Time-Cost Tradeoff, Construction project, Planning

Authors

First Name

A.

Last Name

Belal

MiddleName

M.

Affiliation

M.T.C., Cairo, Egypt.

Email

-

City

-

Orcid

-

First Name

M.

Last Name

Hasan

MiddleName

K.

Affiliation

Ph.D. Student, Civil Engineering Department, M.T.C. Ca iro, Egypt.

Email

-

City

-

Orcid

-

First Name

I.

Last Name

Nusair

MiddleName

A.

Affiliation

Ain Shams University, Cairo, Egypt.

Email

-

City

-

Orcid

-

First Name

N.

Last Name

Badra

MiddleName

M.

Affiliation

Ain Shams University, Cairo, Egypt.

Email

-

City

-

Orcid

-

Volume

9

Article Issue

9th International Conference on Civil and Architecture Engineering

Related Issue

6891

Issue Date

2012-05-01

Receive Date

2019-08-07

Publish Date

2012-05-01

Page Start

1

Page End

15

Print ISSN

2636-4379

Online ISSN

2636-4387

Link

https://iccae.journals.ekb.eg/article_44260.html

Detail API

https://iccae.journals.ekb.eg/service?article_code=44260

Order

25

Type

Original Article

Type Code

834

Publication Type

Journal

Publication Title

The International Conference on Civil and Architecture Engineering

Publication Link

https://iccae.journals.ekb.eg/

MainTitle

Time-Cost Tradeoff Problems Solutions for Construction Projects Using Integer Linear Programming.

Details

Type

Article

Created At

22 Jan 2023