Time-Cost Tradeoff Problems Solutions for Construction Projects Using Integer Linear Programming.
Last updated: 24 Dec 2024
10.21608/iccae.2012.44260
Time-Cost Tradeoff, Construction project, Planning
A.
Belal
M.
M.T.C., Cairo, Egypt.
M.
Hasan
K.
Ph.D. Student, Civil Engineering Department, M.T.C. Ca iro, Egypt.
I.
Nusair
A.
Ain Shams University, Cairo, Egypt.
N.
Badra
M.
Ain Shams University, Cairo, Egypt.
9
9th International Conference on Civil and Architecture Engineering
6891
2012-05-01
2019-08-07
2012-05-01
1
15
2636-4379
2636-4387
https://iccae.journals.ekb.eg/article_44260.html
https://iccae.journals.ekb.eg/service?article_code=44260
25
Original Article
834
Journal
The International Conference on Civil and Architecture Engineering
https://iccae.journals.ekb.eg/
Time-Cost Tradeoff Problems Solutions for Construction Projects Using Integer Linear Programming.
Details
Type
Article
Created At
22 Jan 2023