Empirical Model for Prediction the Impact of Change Orders on Construction Projects- Sports Facilities Case Study

Article

Last updated: 04 Jan 2025

Subjects

-

Tags

-

Abstract

Abstract:
In general, Change Orders in construction projects pose a serious problem possibly impacting quality, cost, and time of the projects. Youth Sport Center Construction Project (YSCCP) in Egypt as an example of the sports construction industry have faced quit a number of Change Orders leading to cost increae and time extensions. (9) Groups of youth sport center construction projects experienced (151) Change Orders. These groups of projects were utilized to contemplate different causes of Change Orders, the frequency of their occurrence, the responsible of this Change Order, the cost of Change Orders, and the time extension attributed to these Change Orders. This issue was analyzed to measure the reasons and effects of change orders. This paper presents the relationship between project cost and construction time within construction projects. This paper presents a time-cost relationship model valid for Youth Sport Center construction project. The model included Change Orders categories; Work disciplines (Civil work, Electrical work, Structural work, Architectural work) and Project parties (Owner, Consultant, Contractor, Local Authorities).

DOI

10.21608/iccae.2014.44186

Keywords

Change Order, Construction, impact, cost, Time, Sports Facility

Authors

First Name

Ibraheem

Last Name

Abdel –Rasheed

MiddleName

-

Affiliation

Dr., Professor of Construction Project Management.

Email

-

City

-

Orcid

-

First Name

Mohammed

Last Name

El-Mikawi

MiddleName

Ahmed

Affiliation

Dr., Associate Professor of Construction Project Management.

Email

-

City

-

Orcid

-

First Name

Mohammed

Last Name

Saleh

MiddleName

El-Sayed Abdel-Hamid

Affiliation

Eng.

Email

-

City

-

Orcid

-

Volume

10

Article Issue

10th International Conference on Civil and Architecture Engineering

Related Issue

6836

Issue Date

2014-05-01

Receive Date

2019-08-07

Publish Date

2014-05-01

Page Start

1

Page End

11

Print ISSN

2636-4379

Online ISSN

2636-4387

Link

https://iccae.journals.ekb.eg/article_44186.html

Detail API

https://iccae.journals.ekb.eg/service?article_code=44186

Order

24

Type

Original Article

Type Code

834

Publication Type

Journal

Publication Title

The International Conference on Civil and Architecture Engineering

Publication Link

https://iccae.journals.ekb.eg/

MainTitle

Empirical Model for Prediction the Impact of Change Orders on Construction Projects- Sports Facilities Case Study

Details

Type

Article

Created At

22 Jan 2023