Beta
33636

Risk Management as an Approach to Control Construction Projects Costs

Article

Last updated: 22 Jan 2023

Subjects

-

Tags

-

Abstract

Cost overrun risks are very common in construction sector. These risks are the possibility of a cost deviation occurrence consequently, affecting the project costs and the involved parties. Cost overrun risks also affect investment in construction sector negatively and focusing on risk reduction measures. Cost control isn't confined to cost management only but also, risk management is considered an effective control tool of project costs. Cost overrun risks are identified and then risk assessment and analysis are done. Then risk management and risk mitigation are carried out. The purpose of this study is to present an approach that can assess cost overrun risks after identifying them. Then, resorting to response strategies to create a response plan for high-priority risks, the researcher conducted a survey research by applying a questionnaire among the specialists in the construction industry and chose the touristic projects in Port Said as a case study. The risk identification techniques more frequently applied in construction are checklist and Brain storming, in addition the risk assessment and analysis technique (the qualitative technique).

DOI

10.21608/pserj.2016.33636

Keywords

Cost Overrun, Risk, Matrix, qualitative analysis, Response Plan

Authors

First Name

Mostafa

Last Name

El-Ahwal

MiddleName

-

Affiliation

Department of architecture and urban planning, faculty of engineering, Port Said University

Email

whitehouse.egy@gmail.com

City

Cairo

Orcid

-

First Name

Sherif

Last Name

El- Attar

MiddleName

Sabry

Affiliation

Professor at Department of Architectural Engineering and Urban Design, Faculty of Engineering, Port Said, Egypt,

Email

sma00@fayoum.edu.eg

City

-

Orcid

-

First Name

Walaa

Last Name

Abdel-Hafez

MiddleName

Ahmed

Affiliation

M.Sc. Candidate at Architectural Engineering and Urban Design Department, Faculty of Engineering, Port Said, Egypt

Email

walaa_ahmed22222@yahoo.com

City

-

Orcid

0000-0002-5623-9980

Volume

20

Article Issue

1

Related Issue

5619

Issue Date

2016-03-01

Receive Date

2016-02-10

Publish Date

2016-03-01

Page Start

44

Page End

62

Print ISSN

1110-6603

Online ISSN

2536-9377

Link

https://pserj.journals.ekb.eg/article_33636.html

Detail API

https://pserj.journals.ekb.eg/service?article_code=33636

Order

5

Type

Original Article

Type Code

813

Publication Type

Journal

Publication Title

Port-Said Engineering Research Journal

Publication Link

https://pserj.journals.ekb.eg/

MainTitle

-

Details

Type

Article

Created At

22 Jan 2023