Improvement of Productivity Using Tromp Curve Measurement for Cement Separator Processing Technology
Last updated: 03 Jan 2025
10.21608/sjou.2016.31761
Tromp Curve, Cement Separator, Portland, Improvement of Productivity
T.
Belhaj
k.
Mechanical Engineering Department, Faculty of Engineering Shoubra, Benha University;
M.
Higazy
G.
Mechanical Engineering Department, Faculty of Engineering Shoubra, Benha University;
A.
Gaafer
M.
Mechanical Engineering Department, Faculty of Engineering Shoubra, Benha University;
B.
ELMogy
A. K.
Mechanical Engineering Department, Faculty of Engineering Shoubra, Benha University;
3
2
5380
2016-07-01
2016-04-10
2016-07-01
35
44
2314-8640
2356-8119
https://sjou.journals.ekb.eg/article_31761.html
https://sjou.journals.ekb.eg/service?article_code=31761
6
Original Article
724
Journal
Scientific Journal of October 6 University
https://sjou.journals.ekb.eg/
Improvement of Productivity Using Tromp Curve Measurement for Cement Separator Processing Technology
Details
Type
Article
Created At
22 Jan 2023