Decommissioning Plan and Cost Estimation of TRICOII Research Reactor

Article

Last updated: 03 Jan 2025

Subjects

-

Tags

-

Abstract

Abstract
Decommissioning is the final stage of the reactor lifetime. A preliminary decommissioning plan has been presented for the TRIGA Mark II Research Reactor which is owned by the Democratic Republic of Congo (TRICO II). The first step in the decommissioning plan is the safe handling of the spent nuclear fuel to its final destination. Monte Carlo MCNPX code was used for modeling the history of the spent fuel of the reactor. The activity and inventory of the radionuclides for the spent fuel of the reactor were calculated. These data are necessary to support the decision-makers and the radiation protection requirements.
The decommissioning strategy, management, organization, and decommissioning activities were presented based on the IAEA guidelines. The cost estimate of the decommissioning of the TRICO II reactor was calculated using IAEA software, CERREX code. The input inventories of the decommissioning activities were estimated.
The calculated total activity for the spent nuclear fuel is equal to 19.32 E+02 Ci. and the average value for each spent fuel element was about 27.603 Ci. Pu-239, Pu-241, and U-233 are fissile nuclides produced during TRICO II operation periods, their total amount is about 4.0 g of fissile nuclides.
Also, the results showed that the estimated decommissioning cost was about six million US dollars, which is in the range of cost estimation for similar TRIGA reactors. Moreover, the total amount of radioactive waste generated from the decommissioning activities has been estimated to be about, 806.5 tons of low-level waste, which can be managed.

DOI

10.21608/ajnsa.2022.97641.1514

Keywords

Keywords: TRICO II Research Reactor, Decommissioning plan, MCNPX code, CERREX code, radionuclides, Radioactivity, Decommissioning cost

Authors

First Name

Heritier

Last Name

Tshitenge

MiddleName

Beya

Affiliation

Commissariat General al Energie Atomic (CGEA), DR Congo

Email

heritierbeya@live.fr

City

DR Congo

Orcid

-

First Name

Rowayda

Last Name

Mahmoud

MiddleName

Fayez

Affiliation

Egyptian Atomic Energy Authority, 3 Ahmed El- Zomor, Cairo, Egypt

Email

eng-rowayda.fayez@alexu.edu.eg

City

Cairo

Orcid

0000-0003-4199-9706

First Name

Ahmed

Last Name

El-Saghir

MiddleName

Emad El-Din

Affiliation

Nucl. Eng. Dept., Faculty of Eng. Alexandria University, Alexandria, Egypt

Email

ahmed_emad@hotmail.com

City

Cairo

Orcid

-

First Name

Alya

Last Name

Badawi

MiddleName

Adel

Affiliation

Nuclear & Radiation Engineering Department, Alexandria University, Alexandria, Egypt

Email

alyabadawi@yahoo.com

City

Cairo

Orcid

-

First Name

Mohamed

Last Name

Shaat

MiddleName

K

Affiliation

Egyptian Atomic Energy Authority (EAEA), Cairo, Egypt

Email

m_shaat3073@yahoo.com

City

Cairo

Orcid

0000-0002-9558- 63

Volume

55

Article Issue

3

Related Issue

35364

Issue Date

2022-07-01

Receive Date

2021-09-23

Publish Date

2022-07-01

Page Start

10

Page End

20

Print ISSN

1110-0451

Online ISSN

2090-4258

Link

https://ajnsa.journals.ekb.eg/article_235578.html

Detail API

https://ajnsa.journals.ekb.eg/service?article_code=235578

Order

2

Type

Original Article

Type Code

455

Publication Type

Journal

Publication Title

Arab Journal of Nuclear Sciences and Applications

Publication Link

https://ajnsa.journals.ekb.eg/

MainTitle

Decommissioning Plan and Cost Estimation of TRICOII Research Reactor

Details

Type

Article

Created At

22 Jan 2023