A process for establishing an Integrated Management System (IMS) for operation and maintenance of the ETRR-2 reactor is initiated. Development and application of the IMS consider the usage of a graded approach in order to commensurate the resources devoted to management system with the importance of an item/activity and the magnitude of the risks. Literatures have introduced different methods for the concept of graded approach which is very important in applying the management, safety and technical requirements. This paper provides an additional example for the methodology of applying such approach. It suggests a grading methodology and determines the considerations that need to be taken into account in grading the application of IMS requirements. The paper introduces a proposal for classification of items or activities in the ETRR-2 into four grades. Then gives a grading example of specific controls for maintenance of structures, systems and components (SSCs) in the plant and explains the management requirements appropriate for each grade. Finally, the approach is explained briefly using an application practice on the Standby Power Supply system of the plant as a case study.
DOI
10.21608/ajnsa.2021.34593.1376
Keywords
Integrated Management System, Graded approach, Maintenance Strategy, Standby power supply system
Authors
Affiliation
Department of Nuclear Safety and Radiological Emergency-NCRRT centre
Egyptian Atomic Energy Authority (EAEA), Cairo, Egypt
Email
ayman_eisa@yahoo.com
Orcid
-Link
https://ajnsa.journals.ekb.eg/article_154801.html
Detail API
https://ajnsa.journals.ekb.eg/service?article_code=154801
Publication Title
Arab Journal of Nuclear Sciences and Applications
Publication Link
https://ajnsa.journals.ekb.eg/
MainTitle
-