Beta
391848

Improving Productivity of Men's Suit Jacket Production Lines through Time Study "Case Study"

Article

Last updated: 25 Dec 2024

Subjects

-

Tags

-

Abstract

Today, the ready-made garment industry faces some challenges in terms of quality, on-time delivery and cost. To improve these aspects, it is necessary to improve productivity. Although the ready-made garment industry has many departments, the processes in the production hall as well as the labor in the production lines play a major role. Therefore, the proper use of line balancing technology can help the production line achieve better productivity. Productivity in ready-made garment factories is a vital measure of operational efficiency and competitiveness. It can be defined in terms of the effectiveness of labor, materials and equipment, and measured using various methods, including time and motion studies, line balancing, standard minute value, efficiency measures, and lean manufacturing techniques. By using these methods, ready-made garment factories can identify inefficiencies, streamline operations and significantly enhance their productivity. Measuring productivity is of utmost importance. Enhancing productivity is essential to increasing profits using the same resources. In this research, a case study was conducted in one of the men's suit factories for the men's suit jacket product, where the current situation of the current suit jacket production lines was analyzed using a time study and some improvements were made to the path of some production processes to achieve the highest productivity and balance the production lines to obtain the best use of equipment, raw materials and labor, and develop an appropriate model to improve the productivity of men's suit jacket.

DOI

10.21608/idj.2024.329194.1205

Keywords

Improving productivity, Men's Suit Jacket Production Lines, Time Study

Authors

First Name

Mostafa

Last Name

Badawy

MiddleName

-

Affiliation

Faculty of Technology of Industry and Energy, Samannoud Technological university

Email

mostafabadawy1990@gmail.com

City

-

Orcid

-

First Name

Marim

Last Name

Hussien

MiddleName

-

Affiliation

Faculty of Applied Arts, Damietta University

Email

marim.aziem87@gmail.com

City

-

Orcid

-

Volume

15

Article Issue

1

Related Issue

47353

Issue Date

2025-01-01

Receive Date

2024-08-28

Publish Date

2025-01-01

Page Start

281

Page End

298

Print ISSN

2090-9632

Online ISSN

2090-9640

Link

https://idj.journals.ekb.eg/article_391848.html

Detail API

https://idj.journals.ekb.eg/service?article_code=391848

Order

19

Type

Original Article

Type Code

1,217

Publication Type

Journal

Publication Title

International Design Journal

Publication Link

https://idj.journals.ekb.eg/

MainTitle

Improving Productivity of Men's Suit Jacket Production Lines through Time Study "Case Study"

Details

Type

Article

Created At

25 Dec 2024