Optimal construction scheduling: A trade-off approach between project time, cost, and residual flexibility
Last updated: 23 Dec 2024
10.21608/ejmtc.2023.210826.1255
Delay's recovery, schedule optimization, schedule's residual flexibility, TCT
Mohammed
Belal
Adel
Construction and Building Engineering Department, College of Engineering and Technology, Arab Academy for Science, Technology, and Maritime Transport, Cairo, Egypt.
m.a.belal@outlook.com
Ahmed
Elhakeem
Abdelmoaty
Construction and Building Engineering Department, College of Engineering and Technology, Arab Academy for Science, Technology, and Maritime Transport, Cairo, Egypt
hakm73@yahoo.com
El Rahab City
7
2
43650
2023-09-01
2023-05-13
2023-09-01
125
134
2357-0954
2357-0946
https://ejmtc.journals.ekb.eg/article_304336.html
https://ejmtc.journals.ekb.eg/service?article_code=304336
4
Original Article
307
Journal
Journal of Engineering Science and Military Technologies
https://ejmtc.journals.ekb.eg/
Optimal construction scheduling: A trade-off approach between project time, cost, and residual flexibility
Details
Type
Article
Created At
23 Dec 2024