Optimal construction scheduling: A trade-off approach between project time, cost, and residual flexibility

Article

Last updated: 23 Dec 2024

Subjects

-

Tags

Civil and Architecture Engineering

Abstract

Achieving project scope on time at minimum cost is important for 
contractors to ensure profitability. Existing models attempt to arrive 
at optimal schedules, but without considering the delays that occur 
during construction, which have been statistically proven to occur on 
most projects. Since these schedules cannot guarantee delays recovery, 
it cannot be claimed optimal. Hence, this paper attempts to incorporate 
delay recovery during construction into the optimal schedule generation. 
Recovering delays that occur over the life of the project construction 
requires a set of project crashes for the remaining and incomplete 
activities in the project. Ensuring that the incomplete activities can 
be crashed at low cost in conjunction with the progress of the project 
construction represents a proposed solution to such a problem. And it is 
called in this paper the schedule's residual flexibility. In developing an 
optimal schedule, a trade-off between the project time, cost, and residual 
flexibility is considered. 

DOI

10.21608/ejmtc.2023.210826.1255

Keywords

Delay's recovery, schedule optimization, schedule's residual flexibility, TCT

Authors

First Name

Mohammed

Last Name

Belal

MiddleName

Adel

Affiliation

Construction and Building Engineering Department, College of Engineering and Technology, Arab Academy for Science, Technology, and Maritime Transport, Cairo, Egypt.

Email

m.a.belal@outlook.com

City

-

Orcid

-

First Name

Ahmed

Last Name

Elhakeem

MiddleName

Abdelmoaty

Affiliation

Construction and Building Engineering Department, College of Engineering and Technology, Arab Academy for Science, Technology, and Maritime Transport, Cairo, Egypt

Email

hakm73@yahoo.com

City

El Rahab City

Orcid

-

Volume

7

Article Issue

2

Related Issue

43650

Issue Date

2023-09-01

Receive Date

2023-05-13

Publish Date

2023-09-01

Page Start

125

Page End

134

Print ISSN

2357-0954

Online ISSN

2357-0946

Link

https://ejmtc.journals.ekb.eg/article_304336.html

Detail API

https://ejmtc.journals.ekb.eg/service?article_code=304336

Order

4

Type

Original Article

Type Code

307

Publication Type

Journal

Publication Title

Journal of Engineering Science and Military Technologies

Publication Link

https://ejmtc.journals.ekb.eg/

MainTitle

Optimal construction scheduling: A trade-off approach between project time, cost, and residual flexibility

Details

Type

Article

Created At

23 Dec 2024